Completed:
- Design of a freestanding steam boiler room 20 t / h with auxiliary systems and integration
Design Institute "Turbopar" has completed the development of design documentation for an industrial boiler plant for the object: "Construction of a boiler house at 3 Akademika Pavlova St. in Mogilev"
Construction type: | Construction of a new building |
Scope of work: | A stand-alone steam boiler plant with a steam capacity of 20 t / h with auxiliary systems and the integration of steam and heating networks into the plant system. |
Object: | "Construction of a boiler plant at 3 Akademika Pavlova St. in Mogilev" |
Location: | Mogilev city, Republic of Belarus |

The design documentation received a positive opinion from Gosstroyexpertiza.
The project used boiler equipment manufactured by STEAMRATOR OY STEAM 5000 - 4 sets.
The construction will be carried out at the production site of the existing production in the conditions of a high accumulation of overground and underground communications and networks. To optimize the cost of construction, the Customer has set the task of assembling and placing a boiler plant of minimum dimensions without removing the collectors and water pipelines located underground. When designing a steam boiler room, the Turbopar design institute uses the Revit software package and all sections of the design documentation will be performed in the BIM design environment.