Completed:
- Boiler room modernization
Construction type: | Boiler room modernization |
Scope of work: | design and survey work instrumental examination |
Object: | "Modernization of the boiler plant in Osipovichi with replacement of the steam boiler" |
Location: | Osipovichi city, Republic of Belarus |

The Turbopar Design Institute completed the development of the design of an industrial boiler plant for the object "Modernization of the boiler plant in Osipovichi with the replacement of a steam boiler" and received a positive conclusion.
The complex of works on the object included a full range of design and survey work, including instrumental examination of the load-bearing structures of buildings and structures subject to stress. The working documentation provides for the installation of a new fire-tube steam boiler with a steam capacity of 16 t / h, a chimney, a deaeration system and feed pumps.
We express our gratitude to the Customer for the prompt and high-quality work.